The complete removal of plugs must be achieved to bring the wellbore online and achieve maximum production. Failure to remove plugs causes formation decline and associated nonproductive time (NPT). Greenwell’s frac-stim solutions effectively remove all plugs, even in highly-deviated, long-horizontal wellbores. Operators save time on location and overall well costs by using effective plug drilling chemistries that reduce the number of required trips.
Greenwell’s chemical trailers provide large quantities of specialty chemicals to mixing plants and pump trucks. The trailers’ meters ensure accurate chemical delivery, and using large totes minimizes well site waste by eliminating chemical buckets.