The Aertssen Group is a Belgian family business, established in 1964, which has grown to one of the leading earth moving, heavy lift and heavy transport contractors in Europe. Aertssen Machinery Services (AMS) is a heavy lifting and heavy transport company active in the Middle East. Our offices are located in Qatar, UAE and Oman, but we also have activities in Egypt and Kuwait. Our Middle East crane and heavy lift division is specialized in the field of vertical and horizontal heavy transport. We provide a wide range of mobile telescopic cranes (Tandano, Liebherr), telescopic crawler cranes (Hitachi & Terex), lattice boom crawler cranes, mobile tower cranes and SPMTs (Self Propelled Modular Trailers). Furthermore we have a broad fleet of trucks and trailers.Not only do we work on a rental basis, but far more on a contracting basis. Our specialized engineering department can provide many additional services to make sure we have the right approach for every project.
Platinum Hotel Apartments Office No. 1, Mezzanine Floor Khalid Bin Waleed Street, P.O Box 40196 Abu Dhabi, United Arab Emirates, Abu Dhabi, United Arab Emirates
Office building No 6, 1st Floor Bldng 311 C-Ring road, PO Box 6029
Contact Person :
Doha,
Qatar
Ph: +x xxxxxxxxxx
Email: xxxxxx@xxxx
Gulf Earth Moving WLL
Wakrah Main Road Opposite Civil Defense,Blue Office Building, Office 402
Contact Person :
Al-Wakrah,
Qatar
Ph: +x xxxxxxxxxx
Earth Moving Worldwide Ltd
Platinum Hotel Apartments, Mezzanine Floor, Khalid Bin Waleed Street
Contact Person :
Abu Dhabi,
United Arab Emirates
Ph: +x xxxxxxxxxx
Products & Services
Mobile Crane
Mobile Crane
<p>Mobile Crane</p>
Rough Terrain Mobile Crane
Rough Terrain Mobile Crane
<p>Rough Terrain Mobile Crane</p>
Crawler Crane
Crawler Crane
<p>Crawler Crane</p>
Low Bed Trailers & Trucks
Low Bed Trailers & Trucks
<p>Low Bed Trailers & Trucks</p>
Project Management
Project Management
<p><br />At Aertssen we will be pleased to get our hands dirty for you. The manpower, time and knowledge you are lacking to do your hoisting job flawlessly and smoothly, we have it. You rely on the 3D plans of our experts to prepare your project into the smallest details. This will ensure that the realisation will be flawless.</p>
Shutdown management
Shutdown management
<p>Shutdowns and turnarounds sometimes require a considerable amount of lifting and transport activities in a short time frame and on a restricted surface area.</p>
<p>Furthermore, the situation requires extensive discussions and communication between all the parties involved. With such operations, literally every minute counts, because the factory has to be up and running again as soon as possible, without losing sight of safety aspects. Aertssen is happy to take on this coordination, so that you can look back on the completed downtimes with satisfaction and be confident about the next one.</p>
Crane Rental
Crane Rental
<p>Need heavy-duty cranes for your construction project? The crane you need will undoubtedly be among the more than one hundred and fifty cranes in our range: telescopic cranes with a capacity of 40 to 700 tonnes, caterpillar cranes to handle weights between 50 and 600 tonnes and mobile tower cranes with a mast length of 40 to 60 metres.</p>
<p>Help to choose <br /> With the right material you ensure a quick and smooth hoisting or assembly job. Seek the advice of our expert technical team. They will help you in the search for the right crane.</p>
Products & Services
Mobile Crane
Mobile Crane
Mobile Crane
Rough Terrain Mobile Crane
Rough Terrain Mobile Crane
Rough Terrain Mobile Crane
Crawler Crane
Crawler Crane
Crawler Crane
Low Bed Trailers & Trucks
Low Bed Trailers & Trucks
Low Bed Trailers & Trucks
Project Management
Project Management
At Aertssen we will be pleased to get our hands dirty for you. The manpower, time and knowledge you are lacking to do your hoisting job flawlessly and smoothly, we have it. You rely on the 3D plans of our experts to prepare your project into the smallest details. This will ensure that the realisation will be flawless.
Shutdown management
Shutdown management
Shutdowns and turnarounds sometimes require a considerable amount of lifting and transport activities in a short time frame and on a restricted surface area.
Furthermore, the situation requires extensive discussions and communication between all the parties involved. With such operations, literally every minute counts, because the factory has to be up and running again as soon as possible, without losing sight of safety aspects. Aertssen is happy to take on this coordination, so that you can look back on the completed downtimes with satisfaction and be confident about the next one.
Crane Rental
Crane Rental
Need heavy-duty cranes for your construction project? The crane you need will undoubtedly be among the more than one hundred and fifty cranes in our range: telescopic cranes with a capacity of 40 to 700 tonnes, caterpillar cranes to handle weights between 50 and 600 tonnes and mobile tower cranes with a mast length of 40 to 60 metres.
Help to choose With the right material you ensure a quick and smooth hoisting or assembly job. Seek the advice of our expert technical team. They will help you in the search for the right crane.
ONSHORE - Tailing of oxy reactor for QVS - Mesaieed
Qatar
About in 2013 AMS was contacted for the tailing of 336 Tons of Oxyreactor on Qa...
ONSHORE - Tailing of oxy reactor for QVS - Mesaieed
About in 2013 AMS was contacted for the tailing of 336 Tons of Oxyreactor on Qatar Venyl Site. For this operation detailed lifting plans have been outlined and our Terex CC2800-1 with 54m main boom was mobilized. A Terex AC500-2 was used as tailing crane.
OFFSHORE - construction of oil & gas processing unit and storage tanks on Zirku Island
United Arab Emirates
Construction of a facility on Zirku Island to separate gas from crude oil colle...
OFFSHORE - construction of oil & gas processing unit and storage tanks on Zirku Island
Construction of a facility on Zirku Island to separate gas from crude oil collected in the SARB and Umm Al Lulu oil fields. The oil and gas processing facility in Zirku Island has a daily capacity of 200,000 barrels of oil, equivalent to 160,000 200-liter drums, and 35 million cubic feet of gas.For this project, AMS shipped a 145 mobile Crane and a 150 ton Crawler Crane to Zirku Island.For another client AMS is assisting the construction of a 7th Crude Oil Storage Tank with a total capacity of 1million barrels.
ONSHORE - Lifting or Steel Jacket from Oil rig on a Barge
United Arab Emirates
When Denholm Yam needed to lift two steel jackets from an oil rig, it was up to...
ONSHORE - Lifting or Steel Jacket from Oil rig on a Barge
When Denholm Yam needed to lift two steel jackets from an oil rig, it was up to AMS that they turned for help, and with good reason. Before being placed on barges, the steel jackets need to be carefully positioned, with 261 tons of apiece. The AMS solution was to use four cranes: two main cranes with a 400 ton capacity and two 280 tons capacity cranes to help control the jackets while they were being moved. All four cranes needed to be coordinated, since the movement of one crane would inevitably affect the movement of the others. The process was facilitated by the AMS extensive planning and 3D drawings demonstrating how the operation should proceed. Conducted with minute precision and the utmost care, The cranes should work in tandem, although cranes were involved. The cranes and counterweights needed to be aligned at all times. And once again careful preparation, combined with deep engineering, extensive experience and raw know-how enabled.
OFFSHORE - Shuttdown or Adma refinery on Das Island
United Arab Emirates
Shutdowns and turnarounds sometimes require a limited amount of lifting and tra...
OFFSHORE - Shuttdown or Adma refinery on Das Island
Shutdowns and turnarounds sometimes require a limited amount of lifting and transport activities in a short-time frame and on a restricted surface area.Furthermore, the situation requires extensive discussions and communication between the parties involved. With such operations, literally every minute counts, because the factory has a lot of potential, without losing sight of safety aspects. Aertssen is happy to take on this coordination, so that you can look forward to the next one.The Adma refinery on Das Island was temporarily shut down to allow for an expansion project. Meanwhile, numerous offshore lifting projects needed to be outsourced. Given its ability to plan, engineer, provide equipment and perform such heavy lifts, AMS was the perfect partner in the construction and construction industry.
ONSHORE - Ruwais Refinery Expansion Project
United Arab Emirates
AMS assisted in the expansion of UAE's largest downstream facility to double it...
ONSHORE - Ruwais Refinery Expansion Project
AMS assisted in the expansion of UAE's largest downstream facility to double its capacity to more than 800,000 barrels a day. The facility started commissioning in 2015 and during the expansion AMS interest out of various cranes for construction of jetty; general construction works; erection of storage tanks, boilers & pressure tanks. We installed 12 major components weighing up to 213ton. The largest item was 62m tall.
OFFSHORE - integrated gas development expansion project on Das Island
United Arab Emirates
AMS has been chosen as a preferred partner to assist with numerous lifting acti...
OFFSHORE - integrated gas development expansion project on Das Island
AMS has been chosen as a preferred partner to assist with numerous lifting activities during expansion of the refinery. Numerous offshore lifting projects supporting construction of new facilities on the island, to increase offshore processing facilities, including land reclamation. AMS assisted with providing lifting plans, ground bearing studies, method statement and risk assessments. In total 7 cranes (mobile and crawler cranes) were shipped to Das Island.
ONSHORE - Expansion of Borouge 3
United Arab Emirates
Assembly & installation of Silos; Hire of multiple mobile Cranes with operator ...
ONSHORE - Expansion of Borouge 3
Assembly & installation of Silos; Hire of multiple mobile Cranes with operator and CNIA Gate pass for Heavy Lift Services; manipulation of storage tanks at lump sum price.
Fujairah Oil terminal
United Arab Emirates
AMS was contacted to execute the vibro hammering activities to prepare the Quay...
Fujairah Oil terminal
AMS was contacted to execute the vibro hammering activities to prepare the Quay wall. For this project different mobile cranes between 40 and 400Ton were mobilized.
Projects
ONSHORE - Tailing of oxy reactor for QVS - Mesaieed
Qatar
About in 2013 AMS was contacted for the tailing of 336 Tons of Oxyreactor on Qatar Venyl Site. For this operation detailed lifting plans have been outlined and our Terex CC2800-1 with 54m main boom was mobilized. A Terex AC500-2 was used as tailing crane.
ONSHORE - Tailing of oxy reactor for QVS - Mesaieed
About in 2013 AMS was contacted for the tailing of 336 Tons of Oxyreactor on Qatar Venyl Site. For this operation detailed lifting plans have been outlined and our Terex CC2800-1 with 54m main boom was mobilized. A Terex AC500-2 was used as tailing crane.
OFFSHORE - construction of oil & gas processing unit and storage tanks on Zirku Island
United Arab Emirates
Construction of a facility on Zirku Island to separate gas from crude oil collected in the SARB and Umm Al Lulu oil fields. The oil and gas processing facility in Zirku Island has a daily capacity of 200,000 barrels of oil, equivalent to 160,000 200-liter drums, and 35 million cubic feet of gas.For this project, AMS shipped a 145 mobile Crane and a 150 ton Crawler Crane to Zirku Island.For another client AMS is assisting the construction of a 7th Crude Oil Storage Tank with a total capacity of 1million barrels.
OFFSHORE - construction of oil & gas processing unit and storage tanks on Zirku Island
Construction of a facility on Zirku Island to separate gas from crude oil collected in the SARB and Umm Al Lulu oil fields. The oil and gas processing facility in Zirku Island has a daily capacity of 200,000 barrels of oil, equivalent to 160,000 200-liter drums, and 35 million cubic feet of gas.For this project, AMS shipped a 145 mobile Crane and a 150 ton Crawler Crane to Zirku Island.For another client AMS is assisting the construction of a 7th Crude Oil Storage Tank with a total capacity of 1million barrels.
ONSHORE - Lifting or Steel Jacket from Oil rig on a Barge
United Arab Emirates
When Denholm Yam needed to lift two steel jackets from an oil rig, it was up to AMS that they turned for help, and with good reason. Before being placed on barges, the steel jackets need to be carefully positioned, with 261 tons of apiece. The AMS solution was to use four cranes: two main cranes with a 400 ton capacity and two 280 tons capacity cranes to help control the jackets while they were being moved. All four cranes needed to be coordinated, since the movement of one crane would inevitably affect the movement of the others. The process was facilitated by the AMS extensive planning and 3D drawings demonstrating how the operation should proceed. Conducted with minute precision and the utmost care, The cranes should work in tandem, although cranes were involved. The cranes and counterweights needed to be aligned at all times. And once again careful preparation, combined with deep engineering, extensive experience and raw know-how enabled.
ONSHORE - Lifting or Steel Jacket from Oil rig on a Barge
When Denholm Yam needed to lift two steel jackets from an oil rig, it was up to AMS that they turned for help, and with good reason. Before being placed on barges, the steel jackets need to be carefully positioned, with 261 tons of apiece. The AMS solution was to use four cranes: two main cranes with a 400 ton capacity and two 280 tons capacity cranes to help control the jackets while they were being moved. All four cranes needed to be coordinated, since the movement of one crane would inevitably affect the movement of the others. The process was facilitated by the AMS extensive planning and 3D drawings demonstrating how the operation should proceed. Conducted with minute precision and the utmost care, The cranes should work in tandem, although cranes were involved. The cranes and counterweights needed to be aligned at all times. And once again careful preparation, combined with deep engineering, extensive experience and raw know-how enabled.
OFFSHORE - Shuttdown or Adma refinery on Das Island
United Arab Emirates
Shutdowns and turnarounds sometimes require a limited amount of lifting and transport activities in a short-time frame and on a restricted surface area.Furthermore, the situation requires extensive discussions and communication between the parties involved. With such operations, literally every minute counts, because the factory has a lot of potential, without losing sight of safety aspects. Aertssen is happy to take on this coordination, so that you can look forward to the next one.The Adma refinery on Das Island was temporarily shut down to allow for an expansion project. Meanwhile, numerous offshore lifting projects needed to be outsourced. Given its ability to plan, engineer, provide equipment and perform such heavy lifts, AMS was the perfect partner in the construction and construction industry.
OFFSHORE - Shuttdown or Adma refinery on Das Island
Shutdowns and turnarounds sometimes require a limited amount of lifting and transport activities in a short-time frame and on a restricted surface area.Furthermore, the situation requires extensive discussions and communication between the parties involved. With such operations, literally every minute counts, because the factory has a lot of potential, without losing sight of safety aspects. Aertssen is happy to take on this coordination, so that you can look forward to the next one.The Adma refinery on Das Island was temporarily shut down to allow for an expansion project. Meanwhile, numerous offshore lifting projects needed to be outsourced. Given its ability to plan, engineer, provide equipment and perform such heavy lifts, AMS was the perfect partner in the construction and construction industry.
ONSHORE - Ruwais Refinery Expansion Project
United Arab Emirates
AMS assisted in the expansion of UAE's largest downstream facility to double its capacity to more than 800,000 barrels a day. The facility started commissioning in 2015 and during the expansion AMS interest out of various cranes for construction of jetty; general construction works; erection of storage tanks, boilers & pressure tanks. We installed 12 major components weighing up to 213ton. The largest item was 62m tall.
ONSHORE - Ruwais Refinery Expansion Project
AMS assisted in the expansion of UAE's largest downstream facility to double its capacity to more than 800,000 barrels a day. The facility started commissioning in 2015 and during the expansion AMS interest out of various cranes for construction of jetty; general construction works; erection of storage tanks, boilers & pressure tanks. We installed 12 major components weighing up to 213ton. The largest item was 62m tall.
OFFSHORE - integrated gas development expansion project on Das Island
United Arab Emirates
AMS has been chosen as a preferred partner to assist with numerous lifting activities during expansion of the refinery. Numerous offshore lifting projects supporting construction of new facilities on the island, to increase offshore processing facilities, including land reclamation. AMS assisted with providing lifting plans, ground bearing studies, method statement and risk assessments. In total 7 cranes (mobile and crawler cranes) were shipped to Das Island.
OFFSHORE - integrated gas development expansion project on Das Island
AMS has been chosen as a preferred partner to assist with numerous lifting activities during expansion of the refinery. Numerous offshore lifting projects supporting construction of new facilities on the island, to increase offshore processing facilities, including land reclamation. AMS assisted with providing lifting plans, ground bearing studies, method statement and risk assessments. In total 7 cranes (mobile and crawler cranes) were shipped to Das Island.
ONSHORE - Expansion of Borouge 3
United Arab Emirates
Assembly & installation of Silos; Hire of multiple mobile Cranes with operator and CNIA Gate pass for Heavy Lift Services; manipulation of storage tanks at lump sum price.
ONSHORE - Expansion of Borouge 3
Assembly & installation of Silos; Hire of multiple mobile Cranes with operator and CNIA Gate pass for Heavy Lift Services; manipulation of storage tanks at lump sum price.
Fujairah Oil terminal
United Arab Emirates
AMS was contacted to execute the vibro hammering activities to prepare the Quay wall. For this project different mobile cranes between 40 and 400Ton were mobilized.
Fujairah Oil terminal
AMS was contacted to execute the vibro hammering activities to prepare the Quay wall. For this project different mobile cranes between 40 and 400Ton were mobilized.
Peek into the hidden marketing strategies of your competitors, across industries and
Keyword research made easy and based on actual traffic statistics
Discover new opportunities while reducing risk by learning from your competitor's mistakess
Outbrain has been using SimilarWeb for over a year and it's been instrumental for our ability to analyze our competitive environment, benchmark our performance, keep track of industry trends, and generate new leads.